Arlington Memorial Bridge

Arlington, VA

This project, valued at $192 Million, consists of repairs to the existing bridge structure including structural concrete, latex modified concrete overlay, steel and timber support member repair and replacement, and expansion joint repair and replacement.  Work includes concrete sidewalk repairs, drainage improvements, and bonded asphalt overlay.

 

 

Specialized Engineering’s Role

Specialized Engineering provided construction materials testing for the project. 

  • Utility backfill

  • Structural Fill

  • Soil Compaction

  • Cast-In Place Concrete 

  • Concrete Batch Plant Inspections

  • Asphalt Compaction

  • Asphalt Core Thickness

  • Laboratory Testing (standard/modified proctor, sieve analysis, Atterberg limits, concrete cylinders, dry shrinkage, maximum theoretical density, bulk specific gravity)

Previous
Previous

WVDOH Contracts

Next
Next

Monocacy Boulevard