Brambleton Middle School
Ashburn, VA
Construction of a 184,000 square foot, two story steel framed structure with CMU components placed on a standard spread footing foundation with slab on grade and deck. The site development included the construction of athletic fields. The site related items were grading, utility installation, storm water management, asphalt pavement for new road and parking as well as miscellaneous site concrete elements including the dumpster enclosure and dugout foundations.
Specialized Engineering’s Role
Specialized Engineering provided construction materials testing for the project
Subsurface Exploration
Geotechnical Evaluation
Foundation Soil Bearing
Utility Backfill
Structural Fil
Concrete Reinforcement
Cast-in-Place Concrete
Floor Flatness/Floor Levelness
Masonry observation and testing
Structural Steel Columns & Beam Inspections
Steel Joists
Steel Decking
Firestopping
Air Barrier observations/testing
Asphalt Pavement testing
Roofing
Dampproofing/Waterproofing
Metal Composite Wall Panel testing